Glossary
Kanban glossary
The words people use around kanban boards, defined in a sentence or two, with an example and how each idea shows up in CBSE.CLUB.
B
- Backlog
- The list of work that has been proposed or accepted but not yet started.
- Blocker
- Anything that stops a work item from progressing, such as waiting on a decision, another team or missing information.
- Bottleneck
- The stage in a workflow with the least capacity, where work piles up and which limits how fast the whole system can deliver.
- Burndown chart
- A chart showing remaining work over time in a sprint or project, ideally trending down to zero by the deadline.
C
- Class of service
- A category of work with its own handling rules, such as Expedite, Fixed date, Standard and Intangible.
- Cumulative flow diagram
- A stacked area chart showing how many work items were in each stage over time, used to spot bottlenecks and growing WIP.
- Cycle time
- The time a work item takes from when work on it starts to when it is finished.
D
- Definition of done
- A shared checklist of what must be true before a work item counts as finished.
E
- Epic
- A large body of work that is broken down into smaller stories or cards.
F
- Flow efficiency
- The share of an item’s total time spent actively being worked on, rather than waiting.
K
- Kaizen
- Japanese for “change for the better”: the practice of continuous, small improvements to how work is done.
- Kanban board
- A board with columns for each stage of a workflow, where cards representing work move from left to right as the work progresses.
- Kanban card
- A single piece of work on a kanban board, usually with a title, an owner and details, that moves through the board’s columns.
L
- Lead time
- The total time from when work is requested until it is delivered, including time spent waiting before work starts.
- Little’s Law
- A queueing formula: average time in a system equals average number of items in it divided by average throughput.
P
- Prioritisation
- Deciding the order in which work should be done, based on value, urgency, effort and risk.
- Pull system
- A way of working where people take new work only when they have capacity, instead of having work pushed onto them.
R
- Retrospective
- A regular team meeting to reflect on how work went and agree improvements.
S
- Scrumban
- A hybrid of Scrum and kanban that keeps Scrum’s regular planning and review rhythm but uses kanban’s pull and WIP limits.
- Sprint
- A fixed time box, usually one to four weeks, in which a Scrum team completes a planned set of work.
- Stale card
- A card that has had no activity for a long time and probably no longer reflects real, planned work.
- Standup
- A short daily team meeting to coordinate work, usually 15 minutes or less.
- Swimlane
- A horizontal row across a kanban board that groups cards by type, team, person or priority.
T
- Throughput
- The number of work items a team finishes in a given period, such as cards closed per week.
- Triage
- Reviewing new incoming work to decide whether to accept it, how urgent it is, and where it goes next.
U
- User story
- A short description of a feature from the user’s point of view, often written “As a [user], I want [goal] so that [reason]”.
V
- Velocity
- In Scrum, the amount of estimated work (often story points) a team completes per sprint.
W
- WIP limit
- A cap on how many work items can be in progress at once, in a column or per person, so the team finishes work before starting more.
- Work item age
- How long a card that is still in progress has been in progress so far.