Cycle time measures how long work takes once someone actually starts it. It is the most useful single number for a kanban team because it reflects how smoothly work flows.
Cycle time vs lead time
Lead time starts when the work is requested; cycle time starts when work begins. The difference is time spent waiting in the backlog.
How to reduce it
- Lower WIP.
- Make cards smaller.
- Remove waiting stages and handoffs.
- Swarm on blocked or ageing work.
More in kanban metrics that matter.