Cycle time

The time a work item takes from when work on it starts to when it is finished.

Cycle time measures how long work takes once someone actually starts it. It is the most useful single number for a kanban team because it reflects how smoothly work flows.

Cycle time vs lead time

Lead time starts when the work is requested; cycle time starts when work begins. The difference is time spent waiting in the backlog.

How to reduce it

  • Lower WIP.
  • Make cards smaller.
  • Remove waiting stages and handoffs.
  • Swarm on blocked or ageing work.

More in kanban metrics that matter.