# Kanban vs Scrum: the real differences and how to choose

> Scrum organises work into fixed-length sprints with defined roles. Kanban organises work as a continuous flow with limits on work in progress. Both are agile, and many teams use a bit of each.

Source: https://cbse.club/guides/kanban-vs-scrum · Updated 2026-11-03

### The short version

|  | Scrum | Kanban |
| --- | --- | --- |
| Rhythm | Fixed sprints, usually 1–4 weeks | Continuous flow |
| Roles | Product Owner, Scrum Master, Developers | No required roles |
| Limiting work | Sprint commitment limits what is taken on | Explicit WIP limits per stage or person |
| Change mid-cycle | Discouraged during a sprint | Allowed any time a slot frees up |
| Key metrics | Velocity, burndown | Cycle time, throughput, WIP |
| Meetings | Planning, daily scrum, review, retrospective | None required; many teams hold a short daily standup and periodic reviews |

### How Scrum works

Scrum divides time into sprints. At sprint planning the team chooses a set of items from the product backlog that it believes it can finish. During the sprint it meets daily, and at the end it shows the work in a sprint review and reflects in a retrospective. The Product Owner owns priorities; the Scrum Master helps the team follow and improve the process.

Scrum’s strength is rhythm. Every few weeks there is a natural moment to plan, show work and improve. Its weakness is rigidity when work is unpredictable: a production bug does not wait for the next sprint.

### How kanban works

Kanban has no sprints. Work flows across the board continuously, and the main control is the [WIP limit](https://cbse.club/glossary/wip-limit): when a column is full, you finish something before starting something new. Priorities can change at any moment, because the next card is only chosen when there is room for it. See [what is kanban](https://cbse.club/guides/what-is-kanban) for the basics.

Kanban’s strength is responsiveness and low overhead. Its weakness is that without a rhythm, teams can forget to step back, plan and improve.

### Which one should you choose?

**Choose Scrum when** you build a product in increments, can protect the team from interruptions for a couple of weeks at a time, and benefit from regular demos to stakeholders.

**Choose kanban when** work arrives unpredictably (support, operations, bug fixing, content, personal work), when the team is small, or when you want to improve your current process gradually rather than adopt a new one.

**Use both (Scrumban) when** you like sprint planning and retrospectives but want WIP limits and the freedom to pull urgent work in. This is what most small software teams end up doing in practice.

### Scrumban in practice

- Plan every two weeks, but pull cards one at a time instead of committing to a fixed list.
- Keep WIP limits on In progress and Review.
- Hold a short retrospective at the end of each cycle.
- Measure cycle time instead of story points.

The [sprint board template](https://cbse.club/templates/sprint-board) is set up for exactly this.

### Common myths

- **“Kanban means no planning.”** Kanban teams plan constantly; they just plan smaller and more often.
- **“Scrum boards are kanban boards.”** They look alike, but a board without WIP limits is a task board, not a kanban system.
- **“You must pick one.”** Methods are tools. Use what helps.

## Frequently asked questions

### Is kanban better than Scrum?

Neither is better in general. Kanban suits unpredictable, continuous work; Scrum suits teams building a product in planned increments. Many teams mix them.

### Can you use kanban and Scrum together?

Yes. The combination is often called Scrumban: sprints for planning rhythm, plus WIP limits and pull from kanban.

### Does kanban have sprints?

No. Kanban uses continuous flow. Teams may still hold regular planning and review meetings.