# Pull system

> A way of working where people take new work only when they have capacity, instead of having work pushed onto them.

Source: https://cbse.club/glossary/pull-system · Updated 2026-11-03

In a push system, work is assigned regardless of load. In a pull system, finishing something creates a free slot, and only then is the next item pulled in. WIP limits are what make a board a pull system.

### Origin

Pull systems come from lean manufacturing at Toyota, where a station produced parts only when the next station signalled it needed them.

### Why it helps

Overload becomes visible instead of hidden in someone’s inbox, and priorities can change right up until the moment work is pulled.